Buildings:
- The processing plant has a combined 8,400 sq.ft. of enclosed building space for production, liquid storage, offices, conference room, lab room, break room & restrooms.
- (2) storage containers with adjoining roof.
- The separate front building has a 32’x32’ office area with break room, bathroom and an attached 40’x72’ shop with (2) 12’x14’ OH doors. Under floor hot water heat in the office & shop area.
Grain Receiving/Handling:
- 110,000 lb. cap. pitless truck scale.
- Remote controlled probe w/video in scale room.
- Chain drag under dump to 3,000 bu./hr. leg.
- Raw soybean storage total of 44,000 bu:
(2) GSI 60° cone bottom bins, 12,500 bu. each (new in 2017).
(4) GSI cone bottom bins, 2,000 bu. each.
(2) cone bottom bins, 5,000 bu. each.
(1) square cone bottom bin, 1,000 bu.
Meal Process:
- Bench Industries grain cleaner with 400 bu./hr. capacity.
- Triple pass soybean conditioner w/500,000 btu burner.
- 18,000 gal. LP tank w/vaporizers.
- All legs and conveyors after conditioner are stainless steel for durability and longevity.
- Soybeans are processed through (4) parallel extruders leading to (4) parallel expellers to separate bean oil from the meal.
- (2) roller mills and a hammer mill further process the meal.
- Meal storage total of 530 tons:
(2) elevated Meridian cone bottom bins, 125 tons each, and elevated Lowry cone bottom bins.
Oil Process:
- After oil is separated from the meal, it is stored in (8) tanks, each with identity preserved tagging.
- Total of 62,000 gal. storage.
Control Room houses scale indicator, sample storage, computerized BinMaster SmartBob level indicators. A 3,000 gal. poly tank is elevated within the plant and kept full of water for fire suppression. The plant has a Alliant Energy 2200 amp 480v electric service, a well and septic system. OmniTel high speed internet available.
Included: 18,000 gal. LP tank, All tools, Small support & lab equipment, Quantity of scrap steel & flighting, Air compressor & Pallet racking in 40’x72’ shop, All items present on the day of final settlement/closing.
Not included: Tractor, Skid loader, Forklifts, Vehicles & Equipment as listed on separate auction, Dump trailers are owned by another individual.
Terms: 10% down payment on August 8, 2023. Balance due at final settlement with a projected date of October 16, 2023, upon delivery of merchantable abstract and deed and all objections have been met.
Possession: Projected date of October 15, 2023.
Real Estate Taxes: To be prorated to date of possession on the basis of the last available tax statement. The seller shall pay any unpaid real estate taxes payable in prior years.
View Real Estate Contract
